Promation installed a new engine-moving assembly line in just 10 days.
The Challenge
A large OEM car assembly plant approached Promation in need of a more efficient way to move engines within their facility. What’s more, they needed it installed in only 10 days, to keep downtime at a minimum.
The Promation Solution
Working with the customer to properly understand their needs and challenges, we proposed a side-by-side rack handling system. This system could unload engines from the rack system, then take them to an upper conveyor, to deliver the engines to the vehicles under assembly.
The Benefit
In order to minimize downtime, Promation delivered and installed a fully functional side-by-side rack system in under 10 days. This meant production levels could be maintained with minimal disruption to production and ROI.